Russian energy minister TEHRAN (Reuters) – Iran has asked Russia for an additional $ 2 billion loan to finance projects including thermal power plants, hydroelectric power generation, railways and subway cars, Russian Energy Minister Alexander Novak said on Saturday.
Russian energy minister
“They are asking for about $ 2 billion … They say they got $ 5 billion in promises in 2015 … We have loans for them and they are asking us to raise the total value of $ 5 billion.
He gave no further details.
.
The difference between a suitability assessment and a sustainability assessment
The difference between a suitability assessment and a sustainability assessment in a project feasibility study A feasibility study consists of several key points
It greatly helps in the success of this study, as all steps must be implemented and none of them should be ignored
This is because they work in a circular motion, which are rings that complement each other and help in the success of the project when one of the links is lost
This leads to an imbalance and the inability to implement the feasibility study at the same level of feasibility required,
So in this article, we will explain to you what is the difference between a suitability assessment and a sustainability assessment in a project feasibility study.
Watch here