Tiqnea For economic consulting

  • Technical Services
    • Economic Feasibility Studies
    • Supply of equipment
    • Implementation and management of projects
    • Market Stats
    • Technical and executive consulting
  • About Us
  • Contact us
  • English
    • العربية
  • Feasibility study request
  • Register

Login To Tiqnea Company

  • Login
  • Register

Feasibility study of mineral water plant

  1. Home
  2. Feasibility study of mineral water plant

07 Feb 2022

Share post

Feasibility study of mineral water plant

Water is the secret of life on Earth, but over time the water has become heavily polluted, so many people have resorted to relying on drinking mineral water because they see it as pure and free of impurities compared to ordinary water, and here lies the importance of the mineral water plant project, and to ensure the success of this project on the ground must carry out a feasibility study of the mineral water plant project.

 

Feasibility study of mineral water plant

Feasibility study mineral water plant the importance of studying the feasibility of this project lies in the knowledge of all aspects of it, which is to study the market and competitors, and know all the equipment and machines needed by the project, as well as knowing the percentage of expected profit to be collected the procedure for the establishment of this project, and during the following lines we will show you, dear reader, all the requirements that you will need in the factory, in order to be fully aware of all you need to start the implementation process with the actual steps.

But let us tell you first that if you take the decision to establish this plant, you must prepare a full feasibility study to ensure its success and earn the expected profit from it, so you can ask for help from one of the specialized companies to help you prepare a feasibility study for the project of a mineral water plant.

This project is one of the projects that require a professional feasibility study, and one of the best-specialized companies with extensive experience in the field of preparing a feasibility study that you can use is the technology company for management consulting and feasibility studies, it will give you a full feasibility study that includes all the data and information related to the project in order to ensure your success and earn good profits as a result of its establishment.

The company also offers the investor alternative plans and suggestions in case the project is exposed to any unexpected losses, in addition to the company provides many other services that any investor needs to bring his project to light, such as e-marketing services.

 

Feasibility study of the mineral water bottling plant

Feasibility study of a mineral water plant the feasibility study of a mineral water plant includes many elements that the investor must provide if he wants the success of this project, and the most important of these requirements are the following:

I. location and area of water plant project:

This project needs to be close to water wells or eyes and the place where the plant will be established must have a large area to accommodate all the water purification and bottling equipment and tanks needed for water, but if the project will be opened near a river you can then establish it in an industrial area, this is the most suitable option due to the low costs in addition to the ease of licensing the plant.

Second, the necessary manpower for the project:

A mineral water factory needs workers to make bottles and packaging as well as workers to do the bottle Canning agent, the factory will also need a printing worker for bottles and cartons and another worker for packaging, also can employ a lot of people but when the expansion and development of the project.

 

Equipment for a mineral water bottling plant

The step of providing the necessary equipment for the mineral water plant project is one of the most important steps to study the feasibility of this project, as this equipment is represented in the following:

First factory-specific equipment:

Provide a water purification unit.
Water tanks.
The pump.
Activated carbon filter.
Sand filter.
Water softener device.
Filter mesh.
Pressure vessels.
Ozone generator.
The antiseptic device from ultraviolet radiation. Pure water tank.
II bottle manufacturing equipment:

Provide inflatable machine.
Preform to do the formation of bottles.
Heating system with infrared radiation.
Cooling unit.
Air compressor.
Double cavity molds.
Bottlecap fitting unit.
Sticker unit on them.
Unit to shorten and lengthen the neck of bottles.
Raw materials for transporting, cleaning, and refilling empty bottles.

Marketing mineral water plant project

Marketing is one of the important things that help the success of the project significantly, so the investor can market the project through the following ways:

Head to public places, hotels, restaurants and shops and ask them if they would like to supply mineral water to them at good prices or not. Print advertising leaflets and distribute them to the target places surrounding the factory.
Place a large-sized sign on the plant and also on the road leading to it.
E-marketing of the project through the use of social media by creating special pages in the name of the project on various social media platforms such as Facebook and Twitter, in addition to the work of advertising campaigns funded for the project.

Similar posts

Newest projects in Egypt

New projects in Egypt, the majority of young people are looking for, the newest projects in Egypt, because of the current economic conditions and the difficulty of obtaining any jobs […]

see more

Project from home easy

A project from home is easy, most individuals want to start a project from home is easy ,where small projects contribute to solving the unemployment crisis and providing job opportunities […]

see more

The easiest profitable project

The easiest profitable project, the countries of the world are witnessing economic conditions of decline in addition to the lack of government and private jobs many are trying to rely […]

see more

Projects with little competition

Projects with little competition in light of the economic recession and the difficulty of obtaining government or civil jobs, some try to rely on themselves and start their own self-employment, […]

see more

Easy and simple project of the House

Easy and simple project from home, the establishment of companies and projects is no longer the monopoly of businessmen and foreign investors, but anyone, whatever his possibilities can start his […]

see more

Simple projects in Egypt

Simple projects in Egypt due to the economic conditions experienced by the developing countries and the lack of government job opportunities and the difficulty of getting a job in the […]

see more

التعليقات:

Do you want to subscribe to the mailing list to receive the latest studies and offers?

About Al-Tiqnea

Technical Economic Consulting Company was established in 2012, it was established by a team of investment professionals to become one of the leading investment companies to provide the best management consulting services to local international companies and institutions. Since its inception, the company has continuously expanded to become one of the largest leading consulting firms in the region through its branches located in the Arab world as well as representative offices in Europe.

Quick Links

  • Home
  • Blog
  • Technical Services
  • Contact us
  • About Us

Contact us

00201200006303 info@tiqnea.com

In front of Water Way - Fifth settlement - New Cairo

All copyright are reserved for (el-tiqnea ) 2012 @